Planned maintenance is now announced by email to the members of the affected plants, with a "Planned maintenance" group in notification settings. A "Status" link in the footer now opens the platform status page, which lists incidents and the platform's recorded up and down periods.
The inverter limit now uses the sum of a plant's complete inverter datasheets when no manual value is set. The limit shows on the plant's power graph, forecast strip, alert text and outage-loss export, and the on-site agent clips at it.
On a solar plant's analysis page, the "Park control" tab now shows the grid operator's and the direct marketer's power limit per segment, in percent or watts, with a week or month line graph.
A solar plant's MV/LV transformer station is now a component. The plant's "Transformer stations" page shows each station's operating state, its condition, LV active power and oil temperature, with one curve per station. A "Transformers" tab on the components page and entries in events and tickets link to the station.
mirox 2.15.783 – 2.15.792
Web appImprovements and fixesReports, exports & files